![]() The WPCP’s capacity is intended to accommodate the projected customer growth in the Brush Run Watershed of Peters Township through the design year 2010. The original plant was constructed in 1964 and has been expanded several times with the most recent expansion and upgrade being placed into operation in 1995 at its current capacity. 19. The plant's hydraulic design capacity is 2.0 million gallons per day (MGD) and its organic design capacity is 3,956 lb/day Biochemical Oxygen Demand (BOD). The Brush Run WPCP plant is located on Valleybrook Road near Rt. The Chapter 94 requires owners of sewage facilities to project, plan, and manage future hydraulic, organic, and industrial waste loadings to their sewage facilities.Ģ013 Municipal Wasteload Management Report (PDF 3190 KB) The Pennsylvania Code 25, Chapter 94 requires annual reports to be filed with the PA DEP. Sanitary Authority Billing and Collection Related LinksĪnnual Volume Treated: 478.7 million gallonsĪnnual Power Bill: $84,800 Pollutants RemovedĪmmonia Nitrogen: 67,233 lbs.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |